Lake Monroe DewateringGroundwater control · Sanford, FL(321) 415-8927

Service

Utility and trench dewatering

Sewer, water, storm and force main work below the water table, priced per hundred feet so the dewatering line item in your bid is arithmetic instead of a guess.

Utility contractors are most of our phone calls, and for a reason: Lake Monroe Dewatering keeps trench work moving in ground where gravity sewer means digging eight to fifteen feet down through the Seminole County water table. Dry trench walls that hold a vertical cut, bedding stone that compacts to spec, laser shots that stay true because the box is not floating: that is what predrainage buys on a pipe job.

The setup follows the alignment. Wellpoints jet in along one or both sides of the trench line, a header ties them to the pump, and the system leapfrogs ahead of your crew in stages so the active dig is always in predrained ground. Old main replacements get extra attention, because the original trench bedding acts like a french drain that feeds water straight down the alignment into your new cut. We cut that flow off before the excavator finds it.

Every gallon pumped leaves through a settling tank and a discharge point covered by the FDEP generic permit notice, which matters double on public jobs where the inspector reads the permit before reading the plans. Municipal packages in Longwood, Deltona and across the county are core work for us.

Trench pricing, per hundred feet

Wellpoint system, utility trench run (up to ~100 ft of header)

$3,000 to $8,000

Moves the price: trench depth below the water table, soil fineness, how far the discharge has to travel.

Additional trench footage past the first 100 ft

$2,500 to $7,500

Moves the price: spacing of the wellpoints, jetting conditions, header size.

Rental blocks and emergency rates are on the cost page.

Trench crew questions

How do you price a long trench run?

By the hundred feet. The first hundred feet of header runs $3,000 to $8,000 including mobilization, and each additional hundred feet runs $2,500 to $7,500 depending on depth, soil and spacing. Your linear footage times the table gets you a bid number today.

Can the dewatering leapfrog with my pipe crew?

Yes, and on long runs it should. We set the system in stages ahead of the crew, keep the active section dry, and pull points behind them. The pipe crew never waits on water, and you never pay to dewater six hundred feet you have not reached.

Why did my trench box float on the last job?

Buoyancy from digging below the water table without predrainage. A box in saturated sand takes uplift, walls slough behind it, and bedding will not compact. Wellpoints along the alignment ahead of the dig remove the buoyancy problem instead of fighting it.

Do you handle lift station pits or only linear runs?

Both. A lift station pit is usually a ring of wellpoints or a staged setup depending on depth, and around 15 feet it becomes a two stage job. Tie-in pits along a replacement alignment get sumped while the run stays on wellpoints.

Price your alignment

Published pricing · FDEP discharge permits handled · Based in Sanford

We can take two more wellpoint installs this month. Sump and trench work still has open days.